Mega Block on 5.6.2022
Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 05.06.2022
Matunga-Mulund Up and Dn fast lines from 11.05 am to 03.55 pm
Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.35 pm will be diverted on Dn slow line between Matunga and Mulund stations halting as per their schedule halts and will arrive destination 15 minutes behind schedule.
Up fast line services leaving Thane from 10.50 am to 3.46 pm will be diverted on Up slow line between Mulund and Matunga halting as per their schedule halts and will arrive destination 15 minutes behind schedule.
Panvel- Vashi Up and Dn harbour lines from 11.05 am to 4.05 pm (Excluding Belapur / Nerul – Kharkopar line)
Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 10.33 am to 3.49 pm and Dn Harbour line services to Panvel / Belapur leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.45 am to 3.12 pm will remain suspended.
Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services towards Panvel leaving Thane from 10.01 am to 3.20 pm will remain suspended.
Special local trains will run on Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.
Transharbour line services will be available between Thane – Vashi / Nerul stations during the block period.
Belapur / Nerul – Kharkopar line services will be available during block period.
These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.
***
CR – Night Traffic Blocks for Infra Works
Central Railway will operate night traffic and power blocks for dismantling of foot over bridge girders at Dadar station (at km 08 / 15 – 16) and for dismantling of N – type old foot over bridge at Thakurli station (at km 49 / 13 – 14). The details are as under:
Block – 1
On 3.6.2022 / 4.6.2022 (Fri / Sat Night) From 00.40 hrs to 06.00 hrs on Byculla – Matunga Up and Down fast lines
Diversion of Mail / Express Trains
- Up Mail / Express trains arriving CSMT during the block period will be diverted on Up slow line between Matunga and Byculla and will take double halt at Dadar
- Down Mail / Express (Train No. 22105 Indrayani Express) leaving CSMT will be diverted on Dn slow line between Byculla and Matunga and will take double halt at Dadar.
Diversion of Suburban Trains
- Up and Dn fast line suburban locals arriving / leaving CSMT will be diverted on Up and Dn slow line between Matunga and Byculla halting at stations as per their scheduled halts.
Block – 2
On 4.6.2022 / 5.6.2022 (Sat / Sun Night) from 00.40 hrs to 05.40 hrs on Byculla – Matunga Down fast line
Diversion of Dn Mail / Express Train
- Train No. 12051 CSMT – Madgaon Janshatabdi Express will be diverted on Dn slow line between Byculla and Matunga and will take double halt at Dadar platform No.1.
Diversion of Dn Suburban Trains
- Down fast line suburban services will be diverted on down slow line during the block period and will halt as per their scheduled halts
Block – 3
On 4.6.2022 / 5.6.2022 (Sat / Sun Night) from 01.15 hrs to 03.35 hrs on Kalyan – Diva Up and Down Fast / Slow lines
- Down slow line services leaving CSMT from 23.51 hrs to 00.24 (4 locals) will be diverted on Down fast line and will not halt at Kopar and Thakurli stations.
Passengers are requested to bear with the Railway Administration for the inconvenience caused
Source: https://cr.indianrailways.gov.in/
Leave a Reply